Oromia Construction Corporation (OCC) – Multi-Site Water Supply Power Program

  • Addis Ababa, Ethiopia
  • Completed 2023
  • Government
Project Overview

Mike Capital Imports is proud to present one of our most extensive and impactful power delivery programs — our multi-project collaboration with Oromia Construction Corporation (OCC). As one of Ethiopia’s most important government infrastructure institutions, OCC depends on reliable, heavy-duty power solutions that guarantee uninterrupted operation for water supply, construction, and municipal development.

Our relationship with OCC is built on trust, performance, engineering excellence, and consistent on-time delivery, making this partnership one of our strongest and most valued.

Scope of Work

Across all OCC projects, Mike Capital Imports delivered complete end-to-end power engineering services, including:

• Engineering & System Design

Customized generator configurations designed to meet each project’s mechanical and electrical requirements.

• Load Assessment & Technical Consultation

Detailed load analysis to determine exact power demands for water pumping stations, treatment plants, and construction facilities.

• Secure Generator Handling & Transportation

Heavy-duty units transported with correct rigging, protection, and safety precautions — ensuring damage-free delivery to challenging locations.

• Installation, Testing & Commissioning

Our engineering team performed full installation, pre-delivery inspection, testing, synchronization, and commissioning for safe operation.

• On-Time Delivery & Reliability Assurance

Every unit delivered ahead of project deadlines — demonstrating our commitment to discipline, reliability, and national infrastructure development.

Key Projects Completed for OCC
1️⃣ Mayu Water Supply Project
3 x 660KVA Heavy Duty Perkins Generator
A critical water supply project requiring stable and continuous power.
We delivered and commissioned a 3 x 660KVA Perkins-powered NOOR generator ensuring uninterrupted operation for pumping, treatment, and distribution systems — directly impacting thousands of households.
2️⃣ Ejere Water Supply Project
5 × 330KVA NOOR Heavy Duty Generators
Powered by:
• FPT–Iveco Italy Engine
• LS Alternator (France)
• DEEPSEA Control Panel (UK)
These three synchronized units supply dependable power to one of the most important water initiatives in the region. Designed for heavy load cycles and 24/7 performance, the system guarantees stable operation even during peak demand.
3️⃣ Bulbula Project
4 x 1200KVA Heavy Duty Perkins Generator
Industrial Power System for Construction & Water Infrastructure
A major development project requiring a durable generator system to support continuous machinery operation.
Our team provided a tailored solution with full engineering support, ensuring the power system met all site conditions and operational requirements.
4️⃣ Nejo Project
3 x 850KVA Heavy Duty Perkins Generator
High-Capacity Generator Solution for Remote Operations
Delivered and installed for OCC’s Nejo water and infrastructure development works.
Built to withstand rugged environments, the generator ensures continuous power for construction, administration, and water distribution operations — reinforcing our commitment to powering even the most challenging locations.

 

A Strong, Long-Standing Partnership

Our collaboration with OCC stands as one of the most successful power supply programs in Ethiopia.

OCC trusts Mike Capital Imports because we consistently deliver:
✔ Accurate engineering
✔ Professional installation
✔ On-time delivery
✔ Reliable heavy-duty generators
✔ Full technical support
✔ Proven performance across multiple landmark projects

Together, we are powering essential infrastructure that supports communities, enhances water access, and strengthens regional development across Oromia.

Our Commitment

Mike Capital Imports remains dedicated to providing reliable, engineered, and professionally delivered power solutions for Ethiopia’s most critical national projects.

Reliable Power. Delivered On Time. Engineered for Ethiopia.

Project Information

Client Industry
Government

Generator Capacity
1200 kVA

Location
Addis Ababa, Ethiopia

Completion Date
2025

Need a Similar Solution?

Contact us to discuss your power generation requirements.